Dachaigh › Tiotalan dreuchd › Design Engineer I
Design Engineer I: Tuarastalan H-1B
Chleachd 54 iarrtasan cumhaichean-obrach an tiotal dreuchd Design Engineer I. Tuarastal bunasach meadhanach $76,000; leth meadhanach $70,142–$85,390.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Goken America, LLC | 15 | $68,557 |
| Wallace Montgomery and Associates, LLP | 4 | $81,567 |
| Fluor Enterprises, Inc. | 3 | $105,966 |
| Steven Schaefer Associates Inc | 3 | $69,597 |
| Cadence Design Systems, Inc. | 3 | $127,234 |
| Singer Vehicle Design LLC | 2 | $78,739 |
| Sherwood Design Engineers Ltd | 2 | $85,004 |
| Bull Moose Heavy Haul, Inc. | 2 | $70,000 |
| Jezerinac Group, PLLC | 2 | $80,500 |
| Fabcon Precast, LLC | 1 | $86,710 |
| PRIME AE Group, Inc. | 1 | $72,800 |
| Milwaukee Electric Tool Corporation | 1 | $73,112 |
| BEUMER Corporation | 1 | $71,400 |
| NMP Engineering Consultants, Inc. | 1 | $67,600 |
| Servolift LLC | 1 | $88,670 |
| Chief Engineering PLLC | 1 | $76,363 |
| Regal Rexnord Corporation | 1 | $77,833 |
| BlueWave Project Development LLC | 1 | $78,750 |
| Rheem Manufacturing Company | 1 | $62,005 |
| Hutec Engineering Inc | 1 | $79,000 |
| Hyster-Yale Materials Handling, Inc. | 1 | $94,500 |
| Toshiba International Corporation | 1 | $71,490 |
| Sumitomo Electric Wiring Systems, Inc. | 1 | $79,373 |
| Bloom Engineering Company, Inc. | 1 | $87,200 |
| EN Engineering, LLC | 1 | $71,157 |
| Ballinger Company | 1 | $85,500 |
| Daikin Comfort Technologies Manufacturing, L.P. | 1 | $90,083 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $71,490 |
| Ìre II (càileachail) | $94,466 |
| Ìre III (eòlach) | $86,710 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $71,182 |
| FY2024 | 14 | $77,098 |
| FY2025 | 13 | $70,283 |
| FY2026 | 18 | $79,716 |
Bailtean
- Dublin, OH15
- Torrance, CA2
- San Francisco, CA2
- Aliso Viejo, CA2
- Hunt Valley, MD2
- Cincinnati, OH2
- Philadelphia, PA2
- San Jose, CA2
- Trenton, MI1
- Baltimore, MD1
- Brookfield, WI1
- Somerset, NJ1
- Austin, TX1
- Randolph, NJ1
- Memphis, TN1
- Grafton, WI1
- Hanover, MD1
- Boston, MA1
- Montgomery, AL1
- Malden, MA1
- Houston, TX1
- Greenville, SC1
- Farmington Hills, MI1
- Washington, DC1
- Des Moines, IA1
- West Palm Beach, FL1
- Fort Myers, FL1
- Fairfax, VA1
- Charleroi, PA1
- Richmond, VA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).