Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Altera Corporation › SoC Design Verification Engineer

SoC Design Verification Engineer aig Altera Corporation: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd SoC Design Verification Engineer aig Altera Corporation. Tuarastal bunasach meadhanach $109,080; leth meadhanach $95,900–$122,111.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$109,080
Leath mheadhanach nan tuarastalan$95,900–$122,111
Ceudail 10mh–90mh$95,243–$133,307

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20258$109,080

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$93,710–$143,900San Jose, CA17 Sult 20251 Dàmh 2025Dearbhaichte
$108,160–$130,100
Ìre II
Austin, TX30 Cèit 20251 Dàmh 2025Dearbhaichte
$121,416–$146,600Austin, TX12 Cèit 202512 Cèit 2025Dearbhaichte
$95,900–$143,900
Ìre I
Austin, TX2 Cèit 20251 Dàmh 2025Dearbhaichte
$95,900–$143,900
Ìre I
Folsom, CA25 Gibl 20251 Dàmh 2025Dearbhaichte
$110,000–$130,000
Ìre I
Pflugerville, TX4 Gibl 20257 Gibl 2025Dearbhaichte
$154,565–$183,900
Ìre IV
Austin, TX2 Gibl 20252 Gibl 2025Dearbhaichte
$124,197–$150,000
Ìre I
San Jose, CA1 Gibl 20251 Gibl 2025Dearbhaichte

Obraichean eile aig Altera Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).