Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asm America Inc. › Senior Engineer I, Process Engineering

Senior Engineer I, Process Engineering aig Asm America Inc.: Tuarastalan H-1B

24 iarrtasan cumhaichean-obrach airson an dreuchd Senior Engineer I, Process Engineering aig Asm America Inc.. Tuarastal bunasach meadhanach $122,325; leth meadhanach $122,325–$124,414.

Iarrtasan (LCAs)24
Tuarastal meadhanach a chaidh a thabhann$122,325
Leath mheadhanach nan tuarastalan$122,325–$124,414
Ceudail 10mh–90mh$119,864–$137,524

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202624$122,325

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$118,810–$208,000
Ìre III
Phoenix, AZ3 Ògmh 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ3 Ògmh 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ28 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ27 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ19 Cèit 20261 Dàmh 2026Dearbhaichte
$123,885–$208,000
Ìre III
Phoenix, AZ19 Cèit 20261 Dàmh 2026Dearbhaichte
$133,432–$208,000
Ìre III
Phoenix, AZ19 Cèit 20261 Dàmh 2026Dearbhaichte
$139,277–$208,000
Ìre IV
Phoenix, AZ19 Cèit 20261 Dàmh 2026Dearbhaichte
$123,885–$208,000
Ìre III
Phoenix, AZ18 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ18 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ8 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ8 Cèit 20261 Dàmh 2026Dearbhaichte
$118,810–$208,000
Ìre III
Phoenix, AZ7 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ6 Cèit 20261 Dàmh 2026Dearbhaichte
$114,046–$208,000
Ìre III
Phoenix, AZ6 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ5 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ5 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ4 Cèit 20261 Dàmh 2026Dearbhaichte
$123,885–$208,000
Ìre III
Phoenix, AZ4 Cèit 20261 Dàmh 2026Dearbhaichte
$122,325–$208,000
Ìre III
Phoenix, AZ4 Cèit 20261 Dàmh 2026Dearbhaichte
$127,130–$208,000
Ìre IV
Phoenix, AZ28 Gibl 20261 Dàmh 2026Dearbhaichte
$139,277–$208,000
Ìre IV
Phoenix, AZ28 Gibl 20261 Dàmh 2026Dearbhaichte
$145,142–$208,000
Ìre IV
Phoenix, AZ24 Gibl 20262 Sult 2026Dearbhaichte
$126,000–$208,000
Ìre III
Phoenix, AZ9 Màrt 20262 Sult 2026Dearbhaichte

Obraichean eile aig Asm America Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).