Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asm America Inc. › Sr. Field Process Engineer I

Sr. Field Process Engineer I aig Asm America Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Field Process Engineer I aig Asm America Inc.. Tuarastal bunasach meadhanach $90,272; leth meadhanach $90,272–$97,536.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$90,272
Leath mheadhanach nan tuarastalan$90,272–$97,536
Ceudail 10mh–90mh$90,272–$110,613

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20244$90,272

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$90,272–$143,000
Ìre II
Hillsboro, OR28 Samh 202311 Dùbh 2023Dearbhaichte
$90,272–$143,000
Ìre II
Hillsboro, OR23 Samh 202311 Dùbh 2023Dearbhaichte
$90,272–$143,000
Ìre II
Hillsboro, OR23 Samh 202311 Dùbh 2023Dearbhaichte
$119,330–$143,000
Ìre IV
Hillsboro, OR22 Samh 202315 Faoi 2024Dearbhaichte
$119,330–$143,000
Ìre IV
Hillsboro, OR22 Samh 202318 Dùbh 2023Air a tharraing air ais

Obraichean eile aig Asm America Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).