Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asm America Inc. › Senior Mechanical Engineer I

Senior Mechanical Engineer I aig Asm America Inc.: Tuarastalan H-1B

27 iarrtasan cumhaichean-obrach airson an dreuchd Senior Mechanical Engineer I aig Asm America Inc.. Tuarastal bunasach meadhanach $101,483; leth meadhanach $101,483–$101,504.

Iarrtasan (LCAs)27
Tuarastal meadhanach a chaidh a thabhann$101,483
Leath mheadhanach nan tuarastalan$101,483–$101,504
Ceudail 10mh–90mh$101,483–$101,504

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202313$101,483
FY20243$101,504
FY202511$101,504

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$101,504–$172,900
Ìre III
Phoenix, AZ30 Ògmh 202514 Iuch 2025Dearbhaichte
$101,504–$172,900
Ìre III
Phoenix, AZ3 Cèit 20251 Dàmh 2025Dearbhaichte
$101,504–$143,000
Ìre III
Phoenix, AZ19 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$172,900
Ìre III
Phoenix, AZ18 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$143,000
Ìre III
Phoenix, AZ18 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$172,900
Ìre III
Phoenix, AZ18 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$172,900
Ìre III
Phoenix, AZ18 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$172,900
Ìre III
Phoenix, AZ9 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$172,900
Ìre III
Phoenix, AZ5 Gibl 20251 Dàmh 2025Dearbhaichte
$101,504–$143,000
Ìre III
Phoenix, AZ26 Màrt 202525 Sult 2025Dearbhaichte
$101,504–$143,000
Ìre III
Phoenix, AZ24 Sult 20247 Dàmh 2024Dearbhaichte
$101,504–$143,000
Ìre III
Phoenix, AZ23 Lùna 202411 Faoi 2025Dearbhaichte
$97,781–$143,000
Ìre III
Phoenix, AZ5 Gibl 20241 Dàmh 2024Dearbhaichte
$111,821–$143,000
Ìre IV
Phoenix, AZ9 Gearr 202415 Gearr 2024Dearbhaichte
$101,483–$143,000
Ìre III
Phoenix, AZ28 Ògmh 202317 Dùbh 2023Dearbhaichte
$101,483–$150,800
Ìre III
Phoenix, AZ27 Màrt 202312 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ27 Màrt 20239 Sult 2023Dearbhaichte
$101,483–$150,800
Ìre III
Phoenix, AZ27 Màrt 20238 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ27 Màrt 20237 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ27 Màrt 20236 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ27 Màrt 202329 Lùna 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ27 Màrt 202329 Lùna 2023Dearbhaichte
$101,483–$150,800
Ìre III
Phoenix, AZ24 Màrt 20234 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ22 Màrt 20234 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ22 Màrt 20234 Sult 2023Dearbhaichte
$101,483–$126,100
Ìre III
Phoenix, AZ22 Màrt 20237 Sult 2023Dearbhaichte
$85,842–$126,100
Ìre II
Phoenix, AZ21 Màrt 20238 Ògmh 2023Dearbhaichte

Obraichean eile aig Asm America Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).