Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Design Engineer

Design Engineer aig Cadence Design Systems, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Design Engineer aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $126,984; leth meadhanach $121,764–$135,478.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$126,984
Leath mheadhanach nan tuarastalan$121,764–$135,478
Ceudail 10mh–90mh$105,577–$158,234

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$126,984
FY20253$124,197
FY20261$127,234

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$127,234–$156,000
Ìre I
San Jose, CA29 Faoi 20269 Gearr 2026Dearbhaichte
$124,197–$156,000
Ìre I
San Jose, CA29 Cèit 20251 Dàmh 2025Dearbhaichte
$84,947–$149,500
Ìre I
Austin, TX27 Cèit 20251 Dàmh 2025Dearbhaichte
$143,721–$182,000San Jose, CA27 Cèit 20251 Dàmh 2025Dearbhaichte
$180,003–$314,600
Ìre IV
San Jose, CA15 Cèit 20241 Dàmh 2024Dearbhaichte
$119,330–$214,500
Ìre III
Cary, NC15 Cèit 20241 Dàmh 2024Dearbhaichte
$126,984–$205,400
Ìre II
San Jose, CA14 Cèit 20241 Dàmh 2024Dearbhaichte

Design Engineer aig gach neach-fastaidh →

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).