Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Design Engineering Group Director

Design Engineering Group Director aig Cadence Design Systems, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Design Engineering Group Director aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $212,742; leth meadhanach $206,501–$231,616.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$212,742
Leath mheadhanach nan tuarastalan$206,501–$231,616
Ceudail 10mh–90mh$186,177–$256,806

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$210,160
FY20252$186,960
FY20262$253,344

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$282,880–$377,000
Ìre IV
San Jose, CA6 Gibl 20261 Dàmh 2026Dearbhaichte
$223,808–$343,200
Ìre IV
Austin, TX3 Gibl 20261 Dàmh 2026Dearbhaichte
$161,179–$335,400
Ìre IV
Austin, TX10 Iuch 20257 Samh 2025Dearbhaichte
$212,742–$335,400
Ìre IV
Austin, TX14 Màrt 202515 Gibl 2025Dearbhaichte
$239,424–$364,000San Jose, CA22 Cèit 20241 Dàmh 2024Dearbhaichte
$202,842–$335,400
Ìre IV
Austin, TX17 Cèit 20241 Dàmh 2024Dearbhaichte
$210,160–$364,000
Ìre II
Folsom, CA27 Màrt 202415 Gibl 2024Dearbhaichte

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).