Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Scientific Developer II

Scientific Developer II aig Cadence Design Systems, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Scientific Developer II aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $94,702; leth meadhanach $89,450–$104,083.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$94,702
Leath mheadhanach nan tuarastalan$89,450–$104,083
Ceudail 10mh–90mh$85,097–$122,067

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$92,997
FY20253$94,702
FY20263$113,464

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$85,904–$163,800
Ìre III
Santa Fe, NM6 Cèit 20261 Dàmh 2026Dearbhaichte
$134,971–$188,500
Ìre IV
Boston, MA27 Gearr 202621 Lùna 2026Dearbhaichte
$113,464–$178,100
Ìre III
Boston, MA24 Gearr 20261 Iuch 2026Dearbhaichte
$94,702–$160,290
Ìre IV
Santa Fe, NM7 Cèit 20251 Dàmh 2025Dearbhaichte
$83,886–$160,290
Ìre III
Santa Fe, NM7 Cèit 20251 Dàmh 2025Dearbhaichte
$94,702–$160,290
Ìre IV
Santa Fe, NM7 Cèit 20251 Dàmh 2025Dearbhaichte
$92,997–$160,290
Ìre IV
Santa Fe, NM5 Gibl 202422 Gibl 2024Dearbhaichte

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).