Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Sr. AE Manager

Sr. AE Manager aig Cadence Design Systems, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Sr. AE Manager aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $185,099; leth meadhanach $156,374–$198,538.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$185,099
Leath mheadhanach nan tuarastalan$156,374–$198,538
Ceudail 10mh–90mh$144,759–$206,619

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$142,750
FY20242$171,435
FY20252$208,198
FY20262$175,874

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$166,650–$247,000
Ìre IV
Folsom, CA20 Gibl 202621 Sult 2026Dearbhaichte
$185,099–$247,000
Ìre IV
Fremont, CA3 Màrt 202621 Lùna 2026Dearbhaichte
$216,091–$257,400
Ìre IV
San Jose, CA2 Sult 20253 Faoi 2026Dearbhaichte
$200,304–$257,400
Ìre IV
San Jose, CA8 Dàmh 202425 Màrt 2025Dearbhaichte
$196,771–$240,500Austin, TX23 Cèit 20241 Dàmh 2024Dearbhaichte
$146,099–$223,600
Ìre II
Austin, TX12 Màrt 202417 Lùna 2024Dearbhaichte
$142,750–$221,000
Ìre IV
Folsom, CA11 Gibl 202321 Sult 2023Dearbhaichte

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).