Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Sr. Design Engineering Manager

Sr. Design Engineering Manager aig Cadence Design Systems, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Design Engineering Manager aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $178,006; leth meadhanach $178,006–$193,315.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$178,006
Leath mheadhanach nan tuarastalan$178,006–$193,315
Ceudail 10mh–90mh$171,342–$202,201

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$178,006
FY20262$180,107

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$193,315–$260,000
Ìre III
Roseville, CA3 Gibl 20261 Dàmh 2026Dearbhaichte
$166,899–$247,000
Ìre IV
Austin, TX30 Faoi 20261 Lùna 2026Dearbhaichte
$208,125–$279,500
Ìre II
San Jose, CA2 Ògmh 20251 Dàmh 2025Dearbhaichte
$178,006–$279,500
Ìre III
San Jose, CA4 Gearr 202525 Ògmh 2025Dearbhaichte
$178,006–$279,500
Ìre III
San Jose, CA17 Faoi 202525 Ògmh 2025Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).