Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cadence Design Systems, Inc. › Sr. Principal Program Manager

Sr. Principal Program Manager aig Cadence Design Systems, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Principal Program Manager aig Cadence Design Systems, Inc.. Tuarastal bunasach meadhanach $200,733; leth meadhanach $196,355–$201,323.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$200,733
Leath mheadhanach nan tuarastalan$196,355–$201,323
Ceudail 10mh–90mh$189,764–$209,657

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$200,292
FY20252$198,839
FY20261$200,733

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$200,733–$286,000San Jose, CA30 Màrt 202614 Lùna 2026Dearbhaichte
$196,355–$279,500San Jose, CA11 Iuch 202521 Iuch 2025Dearbhaichte
$201,323–$279,500
Ìre IV
San Jose, CA25 Màrt 202512 Sult 2025Dearbhaichte
$215,213–$260,000San Jose, CA24 Lùna 20231 Dàmh 2023Dearbhaichte
$185,370–$260,000San Jose, CA26 Iuch 202314 Lùna 2023Dearbhaichte

Obraichean eile aig Cadence Design Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).