Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › General Motors › Cost Engineer

Cost Engineer aig General Motors: Tuarastalan H-1B

13 iarrtasan cumhaichean-obrach airson an dreuchd Cost Engineer aig General Motors. Tuarastal bunasach meadhanach $124,011; leth meadhanach $115,169–$126,382.

Iarrtasan (LCAs)13
Tuarastal meadhanach a chaidh a thabhann$124,011
Leath mheadhanach nan tuarastalan$115,169–$126,382
Ceudail 10mh–90mh$106,810–$135,257

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20235$124,011
FY20242$102,769
FY20252$116,095
FY20264$131,915

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,382
Ìre II
Warren, MI2 Gibl 20262 Sult 2026Dearbhaichte
$126,382
Ìre II
Warren, MI1 Gibl 20262 Sult 2026Dearbhaichte
$139,968
Ìre III
Warren, MI31 Màrt 202617 Sult 2026Dearbhaichte
$137,448
Ìre IV
Warren, MI24 Màrt 202631 Lùna 2026Dearbhaichte
$117,979
Ìre III
Warren, MI7 Cèit 20251 Dàmh 2025Dearbhaichte
$114,211
Ìre III
Warren, MI25 Gibl 20251 Dàmh 2025Dearbhaichte
$104,960
Ìre III
Warren, MI12 Lùna 202413 Dùbh 2024Dearbhaichte
$100,578
Ìre II
Warren, MI26 Gibl 20241 Dàmh 2024Dearbhaichte
$115,169
Ìre II
Warren, MI13 Sult 202325 Sult 2023Dearbhaichte
$115,169
Ìre II
Warren, MI5 Sult 202325 Faoi 2024Dearbhaichte
$126,135
Ìre II
Warren, MI2 Cèit 20231 Dàmh 2023Dearbhaichte
$126,494
Ìre II
Warren, MI27 Gibl 20231 Dàmh 2023Dearbhaichte
$124,011
Ìre III
Warren, MI30 Màrt 202331 Lùna 2023Dearbhaichte

Cost Engineer aig gach neach-fastaidh →

Obraichean eile aig General Motors

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).