Dachaigh › Luchd-obrach › General Motors › Senior Quality Engineer
Senior Quality Engineer aig General Motors: Tuarastalan H-1B
27 iarrtasan cumhaichean-obrach airson an dreuchd Senior Quality Engineer aig General Motors. Tuarastal bunasach meadhanach $136,180; leth meadhanach $130,644–$152,522.
Iarrtasan (LCAs)27
Tuarastal meadhanach a chaidh a thabhann$136,180
Leath mheadhanach nan tuarastalan$130,644–$152,522
Ceudail 10mh–90mh$121,560–$168,196
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 5 | $133,985 |
| FY2025 | 19 | $137,400 |
| FY2026 | 3 | $135,172 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $135,172 Ìre IV | Warren, MI | 28 Màrt 2026 | 17 Sult 2026 | Dearbhaichte |
| $122,376 Ìre IV | Milford, MI | 27 Faoi 2026 | 12 Ògmh 2026 | Dearbhaichte |
| $185,869 Ìre IV | Mountain View, CA | 5 Faoi 2026 | 5 Faoi 2026 | Dearbhaichte |
| $180,000 Ìre IV | Austin, TX | 17 Sult 2025 | 1 Samh 2025 | Dearbhaichte |
| $116,494 Ìre III | Warren, MI | 10 Sult 2025 | 8 Faoi 2026 | Dearbhaichte |
| $152,466 Ìre IV | Milford, MI | 8 Sult 2025 | 5 Màrt 2026 | Dearbhaichte |
| $152,578 Ìre IV | Warren, MI | 18 Lùna 2025 | 5 Gearr 2026 | Dearbhaichte |
| $136,180 Ìre IV | Warren, MI | 6 Cèit 2025 | 4 Samh 2025 | Dearbhaichte |
| $154,438 Ìre IV | Warren, MI | 31 Màrt 2025 | 12 Lùna 2025 | Dearbhaichte |
| $155,483 Ìre II | Warren, MI | 14 Màrt 2025 | 13 Sult 2025 | Dearbhaichte |
| $141,100 Ìre IV | Warren, MI | 28 Gearr 2025 | 20 Cèit 2025 | Dearbhaichte |
| $114,815 Ìre II | Warren, MI | 10 Gearr 2025 | 22 Iuch 2025 | Dearbhaichte |
| $135,197 Ìre IV | Warren, MI | 7 Gearr 2025 | 13 Ògmh 2025 | Dearbhaichte |
| $146,184 Ìre III | Warren, MI | 3 Gearr 2025 | 7 Iuch 2025 | Dearbhaichte |
| $195,000 Ìre IV | Mountain View, CA | 22 Faoi 2025 | 3 Gearr 2025 | Dearbhaichte |
| $135,197 Ìre IV | Warren, MI | 13 Faoi 2025 | 13 Ògmh 2025 | Dearbhaichte |
| $137,400 Ìre IV | Warren, MI | 27 Dùbh 2024 | 1 Gibl 2025 | Dearbhaichte |
| $135,197 Ìre IV | Warren, MI | 13 Dùbh 2024 | 23 Cèit 2025 | Dearbhaichte |
| $139,472 Ìre III | McKinney, TX | 11 Samh 2024 | 1 Màrt 2025 | Dearbhaichte |
| $126,184 Ìre II | Warren, MI | 29 Dàmh 2024 | 4 Gibl 2025 | Dearbhaichte |
| $123,199 Ìre IV | Warrendale, PA | 8 Dàmh 2024 | 21 Màrt 2025 | Dearbhaichte |
| $120,336 Ìre III | Warren, MI | 25 Sult 2024 | 14 Gearr 2025 | Dearbhaichte |
| $137,156 Ìre IV | Warren, MI | 11 Sult 2024 | 7 Gearr 2025 | Dearbhaichte |
| $133,903 Ìre III | Warren, MI | 29 Lùna 2024 | 24 Faoi 2025 | Dearbhaichte |
| $127,386 Ìre III | Warren, MI | 27 Lùna 2024 | 17 Faoi 2025 | Dearbhaichte |
| $133,985 Ìre II | Warren, MI | 31 Iuch 2024 | 13 Samh 2024 | Dearbhaichte |
| $160,326 Ìre IV | Warren, MI | 11 Iuch 2024 | 14 Sult 2024 | Dearbhaichte |
Senior Quality Engineer aig gach neach-fastaidh →
Obraichean eile aig General Motors
- Senior Software Engineer$145,754
- Software Engineer$118,572
- Design Release Engineer$121,356
- Senior Systems Engineer$140,354
- Senior Design Release Engineer$128,064
- Staff Software Engineer$220,000
- Controller Integration Engineer$109,265
- Controls Design Engineer$106,559
- Senior Researcher$132,985
- Researcher$113,850
- Treasury Associate$126,875
- Senior Embedded Software Engineer$155,000
- Senior Hardware Engineer$138,719
- Manufacturing Controls Engineer$127,300
- Process Controls Engineer$111,384
- Controls System Engineer$122,021
- Cost Engineer$124,011
- Simulation Integration Engineer$110,244
- Senior Controller Integration Engineer$138,840
- Software Developer$118,408
- Java Developer$120,000
- Senior Product Manager$138,586
- Software Engineering$138,796
- Engineering Group Manager$156,757
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).