Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › General Motors › Engineering Group Manager

Engineering Group Manager aig General Motors: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Group Manager aig General Motors. Tuarastal bunasach meadhanach $156,757; leth meadhanach $144,902–$165,324.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$156,757
Leath mheadhanach nan tuarastalan$144,902–$165,324
Ceudail 10mh–90mh$139,802–$174,150

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$146,804
FY20252$156,757
FY20262$188,436

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$213,530
Ìre IV
Warren, MI3 Gibl 20264 Sult 2026Dearbhaichte
$163,342
Ìre IV
Warren, MI12 Dùbh 202517 Cèit 2026Dearbhaichte
$161,207
Ìre IV
Warren, MI28 Lùna 202510 Gearr 2026Dearbhaichte
$152,307
Ìre IV
Warren, MI6 Cèit 20251 Dàmh 2025Dearbhaichte
$150,609
E-3 · Ìre IV
Milford, MI21 Màrt 202329 Cèit 2023Dearbhaichte
$143,000
Ìre II
Warren, MI6 Gearr 202320 Gearr 2023Dearbhaichte
$165,984
Ìre IV
Warren, MI23 Samh 202216 Faoi 2023Dearbhaichte
$169,775
Ìre IV
Warren, MI21 Samh 20222 Faoi 2023Dearbhaichte
$135,332
Ìre IV
Milford, MI17 Samh 202217 Cèit 2023Dearbhaichte
$140,299
E-3 · Ìre IV
Warren, MI4 Dàmh 202221 Samh 2022Dearbhaichte

Obraichean eile aig General Motors

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).