Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › GEODIS Logistics, LLC › Industrial Engineer III - Continuous Improvement

Industrial Engineer III - Continuous Improvement aig GEODIS Logistics, LLC: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Industrial Engineer III - Continuous Improvement aig GEODIS Logistics, LLC. Tuarastal bunasach meadhanach $100,922; leth meadhanach $98,816–$102,414.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$100,922
Leath mheadhanach nan tuarastalan$98,816–$102,414
Ceudail 10mh–90mh$95,137–$104,152

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$96,596
FY20241$107,952
FY20254$100,922
FY20261$99,424

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$99,424–$135,389
Ìre III
Clayton, IN15 Cèit 20261 Dàmh 2026Dearbhaichte
$96,990–$144,266
Ìre III
Plainfield, IN30 Ògmh 202530 Dùbh 2025Dearbhaichte
$100,922–$135,389
Ìre III
Northampton, PA23 Ògmh 202511 Lùna 2025Dearbhaichte
$102,523–$135,389
Ìre II
Auburn, WA16 Gibl 20251 Dàmh 2025Dearbhaichte
$100,922–$135,389
Ìre III
Allentown, PA11 Gearr 202511 Iuch 2025Dearbhaichte
$107,952–$135,389
Ìre III
Monroe Township, NJ23 Sult 202431 Faoi 2025Dearbhaichte
$102,378–$135,389
Ìre III
Edwardsville, IL23 Cèit 20235 Ògmh 2023Dearbhaichte
$90,813–$135,389
Ìre III
Plainfield, IN12 Dùbh 20223 Faoi 2023Dearbhaichte

Obraichean eile aig GEODIS Logistics, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).