Dachaigh › Luchd-obrach › GEODIS Logistics, LLC › Industrial Engineer V - Continuous Improvement
Industrial Engineer V - Continuous Improvement aig GEODIS Logistics, LLC: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Industrial Engineer V - Continuous Improvement aig GEODIS Logistics, LLC. Tuarastal bunasach meadhanach $116,002; leth meadhanach $113,360–$117,978.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$116,002
Leath mheadhanach nan tuarastalan$113,360–$117,978
Ceudail 10mh–90mh$108,568–$125,066
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $105,373 |
| FY2025 | 2 | $116,990 |
| FY2026 | 2 | $121,576 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $113,360–$157,383 Ìre IV | Plainfield, IN | 21 Faoi 2026 | 17 Iuch 2026 | Dearbhaichte |
| $129,792–$157,383 Ìre IV | Coppell, TX | 13 Samh 2025 | 1 Faoi 2026 | Dearbhaichte |
| $117,978–$157,383 Ìre IV | Brentwood, TN | 26 Màrt 2025 | 19 Sult 2025 | Dearbhaichte |
| $116,002–$157,383 Ìre IV | Whitehall, PA | 5 Gearr 2025 | 12 Gearr 2025 | Dearbhaichte |
| $105,373–$157,383 Ìre IV | Plainfield, IN | 6 Iuch 2023 | 17 Iuch 2023 | Dearbhaichte |
Obraichean eile aig GEODIS Logistics, LLC
- Industrial Engineer III - Continuous Improvement$100,922
- Industrial Engineer IV - Continuous Improvement$115,856
- Sr. IT Developer - .Net$122,117
- Developer II$84,864
- IT Architect - Systems$128,419
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).