Dachaigh › Luchd-obrach › GEODIS Logistics, LLC › Sr. IT Developer - .Net
Sr. IT Developer - .Net aig GEODIS Logistics, LLC: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. IT Developer - .Net aig GEODIS Logistics, LLC. Tuarastal bunasach meadhanach $122,117; leth meadhanach $120,994–$134,014.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$122,117
Leath mheadhanach nan tuarastalan$120,994–$134,014
Ceudail 10mh–90mh$118,260–$138,158
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $120,994 |
| FY2025 | 3 | $122,117 |
| FY2026 | 1 | $140,920 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $140,920–$157,383 Ìre IV | Brentwood, TN | 3 Màrt 2026 | 18 Cèit 2026 | Dearbhaichte |
| $122,117–$157,383 Ìre III | Brentwood, TN | 7 Iuch 2025 | 20 Samh 2025 | Dearbhaichte |
| $134,014–$157,383 Ìre IV | Brentwood, TN | 25 Ògmh 2025 | 20 Dùbh 2025 | Dearbhaichte |
| $116,438–$157,383 Ìre III | Brentwood, TN | 7 Màrt 2025 | 26 Lùna 2025 | Dearbhaichte |
| $120,994–$157,383 Ìre IV | Brentwood, TN | 19 Dùbh 2022 | 18 Cèit 2023 | Dearbhaichte |
Obraichean eile aig GEODIS Logistics, LLC
- Industrial Engineer III - Continuous Improvement$100,922
- Industrial Engineer IV - Continuous Improvement$115,856
- Developer II$84,864
- Industrial Engineer V - Continuous Improvement$116,002
- IT Architect - Systems$128,419
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).