Dachaigh › Luchd-obrach › Qorvo US, INC. › Sr. Design Engineer
Sr. Design Engineer aig Qorvo US, INC.: Tuarastalan H-1B
19 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Design Engineer aig Qorvo US, INC.. Tuarastal bunasach meadhanach $117,530; leth meadhanach $112,407–$127,158.
Iarrtasan (LCAs)19
Tuarastal meadhanach a chaidh a thabhann$117,530
Leath mheadhanach nan tuarastalan$112,407–$127,158
Ceudail 10mh–90mh$109,280–$140,240
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $111,650 |
| FY2024 | 7 | $118,434 |
| FY2025 | 7 | $128,422 |
| FY2026 | 1 | $139,050 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $139,050–$150,500 Ìre I | San Jose, CA | 16 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,853–$182,100 Ìre II | San Jose, CA | 31 Iuch 2025 | 30 Sult 2025 | Dearbhaichte |
| $128,422 | Apopka, FL | 24 Ògmh 2025 | 30 Ògmh 2025 | Dearbhaichte |
| $112,614 Ìre II | Chandler, AZ | 5 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $134,078 Ìre II | Greensboro, NC | 5 Ògmh 2025 | 18 Ògmh 2025 | Dearbhaichte |
| $145,000 Ìre IV | Hillsboro, OR | 9 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $116,351 Ìre III | Apopka, FL | 9 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $111,120 Ìre II | Chelmsford, MA | 20 Màrt 2025 | 4 Lùna 2025 | Dearbhaichte |
| $121,721 Ìre II | Chandler, AZ | 23 Lùna 2024 | 20 Dùbh 2024 | Dearbhaichte |
| $120,000 Ìre I | Greensboro, NC | 10 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $118,434 Ìre III | Greensboro, NC | 5 Gibl 2024 | 3 Lùna 2024 | Dearbhaichte |
| $117,470 Ìre III | Apopka, FL | 4 Gibl 2024 | 24 Lùna 2024 | Dearbhaichte |
| $125,895 Ìre II | Greensboro, NC | 29 Gearr 2024 | 18 Ògmh 2024 | Dearbhaichte |
| $114,000 Ìre III | Apopka, FL | 21 Gearr 2024 | 25 Iuch 2024 | Dearbhaichte |
| $102,000–$135,000 Ìre I | San Jose, CA | 27 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $112,200 Ìre III | Apopka, FL | 6 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $111,100 Ìre III | Apopka, FL | 29 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $99,168 Ìre I | Apopka, FL | 21 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $117,530 Ìre III | Apopka, FL | 3 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
Sr. Design Engineer aig gach neach-fastaidh →
Obraichean eile aig Qorvo US, INC.
- Product Development Engineer$102,324
- Test Engineer$96,951
- Design Engineer$97,641
- Sr. Product Development Engineer$119,916
- Sr. RFIC Design Engineer$116,144
- Sr. Characterization Engineer$108,220
- Sr. Filter Design Engineer$117,694
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).