Dachaigh › Luchd-obrach › Qorvo US, INC. › Sr. Product Development Engineer
Sr. Product Development Engineer aig Qorvo US, INC.: Tuarastalan H-1B
8 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Product Development Engineer aig Qorvo US, INC.. Tuarastal bunasach meadhanach $119,916; leth meadhanach $108,883–$122,750.
Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$119,916
Leath mheadhanach nan tuarastalan$108,883–$122,750
Ceudail 10mh–90mh$106,003–$125,000
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $108,527 |
| FY2024 | 5 | $122,000 |
| FY2025 | 2 | $113,417 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $109,002 Ìre II | Greensboro, NC | 20 Màrt 2025 | 10 Ògmh 2025 | Dearbhaichte |
| $117,832 Ìre III | Hillsboro, OR | 5 Dùbh 2024 | 3 Faoi 2025 | Dearbhaichte |
| $100,113 Ìre II | Greensboro, NC | 10 Gibl 2024 | 22 Lùna 2024 | Dearbhaichte |
| $122,000 Ìre IV | Hillsboro, OR | 10 Gibl 2024 | 20 Cèit 2024 | Dearbhaichte |
| $122,000 Ìre IV | Hillsboro, OR | 29 Gearr 2024 | 15 Màrt 2024 | Dearbhaichte |
| $125,000 Ìre IV | Hillsboro, OR | 10 Faoi 2024 | 22 Faoi 2024 | Dearbhaichte |
| $125,000 Ìre IV | Hillsboro, OR | 8 Faoi 2024 | 5 Gearr 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $108,527 Ìre II | Greensboro, NC | 22 Cèit 2023 | 5 Ògmh 2023 | Dearbhaichte |
Sr. Product Development Engineer aig gach neach-fastaidh →
Obraichean eile aig Qorvo US, INC.
- Sr. Design Engineer$117,530
- Product Development Engineer$102,324
- Test Engineer$96,951
- Design Engineer$97,641
- Sr. RFIC Design Engineer$116,144
- Sr. Characterization Engineer$108,220
- Sr. Filter Design Engineer$117,694
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).