Dachaigh › Luchd-obrach › Qorvo US, INC. › Sr. RFIC Design Engineer
Sr. RFIC Design Engineer aig Qorvo US, INC.: Tuarastalan H-1B
7 iarrtasan cumhaichean-obrach airson an dreuchd Sr. RFIC Design Engineer aig Qorvo US, INC.. Tuarastal bunasach meadhanach $116,144; leth meadhanach $111,924–$118,760.
Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$116,144
Leath mheadhanach nan tuarastalan$111,924–$118,760
Ceudail 10mh–90mh$110,830–$121,005
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $114,644 |
| FY2024 | 1 | $111,384 |
| FY2025 | 4 | $117,187 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $112,464 Ìre II | Apopka, FL | 31 Iuch 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $118,230 Ìre II | Apopka, FL | 16 Iuch 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $123,579 Ìre IV | Greensboro, NC | 30 Ògmh 2025 | 2 Sult 2025 | Dearbhaichte |
| $116,144 Ìre II | Apopka, FL | 19 Cèit 2025 | 5 Lùna 2025 | Dearbhaichte |
| $111,384 Ìre IV | Greensboro, NC | 10 Gibl 2024 | 10 Lùna 2024 | Dearbhaichte |
| $110,000 Ìre II | Allen, TX | 11 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $119,289 | Hillsboro, OR | 8 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
Obraichean eile aig Qorvo US, INC.
- Sr. Design Engineer$117,530
- Product Development Engineer$102,324
- Test Engineer$96,951
- Design Engineer$97,641
- Sr. Product Development Engineer$119,916
- Sr. Characterization Engineer$108,220
- Sr. Filter Design Engineer$117,694
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).