Dachaigh › Luchd-obrach › Synechron, Inc. › Assistant Manager - Quality Control
Assistant Manager - Quality Control aig Synechron, Inc.: Tuarastalan H-1B
21 iarrtasan cumhaichean-obrach airson an dreuchd Assistant Manager - Quality Control aig Synechron, Inc.. Tuarastal bunasach meadhanach $84,422; leth meadhanach $79,102–$93,424.
Iarrtasan (LCAs)21
Tuarastal meadhanach a chaidh a thabhann$84,422
Leath mheadhanach nan tuarastalan$79,102–$93,424
Ceudail 10mh–90mh$79,102–$98,000
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $84,745 |
| FY2024 | 8 | $83,651 |
| FY2025 | 4 | $84,266 |
| FY2026 | 2 | $84,775 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $82,000 Ìre II | O'Fallon, MO | 15 Cèit 2026 | 1 Lùna 2026 | Dearbhaichte |
| $87,550 Ìre II | Alpharetta, GA | 15 Cèit 2026 | 1 Lùna 2026 | Dearbhaichte |
| $69,534 Ìre II | O'Fallon, MO | 10 Iuch 2025 | 18 Iuch 2025 | Dearbhaichte |
| $85,000 Ìre II | Alpharetta, GA | 8 Iuch 2025 | 17 Iuch 2025 | Dearbhaichte |
| $83,533 Ìre II | Alpharetta, GA | 30 Ògmh 2025 | 11 Iuch 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $93,250 Ìre II | Alpharetta, GA | 15 Samh 2024 | 27 Samh 2024 | Dearbhaichte |
| $96,140 | Piscataway, NJ | 23 Sult 2024 | 23 Sult 2024 | Air a tharraing air ais |
| $79,102 Ìre II | Charlotte, NC | 18 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $79,102 Ìre II | Charlotte, NC | 11 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $79,102 Ìre II | Charlotte, NC | 14 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $97,000 Ìre II | Charlotte, NC | 5 Cèit 2024 | 3 Ògmh 2024 | Dearbhaichte |
| $88,200 Ìre II | Charlotte, NC | 21 Màrt 2024 | 1 Gibl 2024 | Dearbhaichte |
| $98,000 Ìre II | Glen Allen, VA | 1 Gearr 2024 | 12 Gearr 2024 | Dearbhaichte |
| $98,000 Ìre II | Glen Allen, VA | 6 Dùbh 2023 | 20 Faoi 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $79,102 Ìre II | Charlotte, NC | 29 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $79,102 Ìre II | Charlotte, NC | 20 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $83,845 Ìre II | Charlotte, NC | 15 Ògmh 2023 | 15 Lùna 2023 | Dearbhaichte |
| $110,000 Ìre II | Piscataway, NJ | 17 Gibl 2023 | 1 Cèit 2023 | Dearbhaichte |
| $83,845 Ìre II | Charlotte, NC | 2 Màrt 2023 | 20 Màrt 2023 | Dearbhaichte |
| $93,948 Ìre II | Charlotte, NC | 28 Samh 2022 | 7 Dùbh 2022 | Dearbhaichte |
| $85,645 Ìre II | Nashville, TN | 7 Samh 2022 | 22 Samh 2022 | Dearbhaichte |
Obraichean eile aig Synechron, Inc.
- Associate Specialist - Technology$115,000
- Specialist - Technology$115,960
- Lead - Technology$109,810
- Sr. Specialist - Technology$118,228
- Associate Principal - Technology$120,000
- Sr. Associate - Technology$108,514
- Associate Director - Technology$124,300
- Specialist - Quality Control$100,469
- Manager, Technology$112,986
- Lead – Quality Control$99,549
- Assistant Manager - Technology$109,550
- Sr. Manager - Technology$112,500
- Associate Specialist - Quality Control$102,326
- Sr. Specialist - Quality Control$108,225
- Sr. Manager - Quality Control$103,418
- Associate - Technology$107,487
- Manager, Quality Control$97,570
- Director, Technology$162,000
- Associate Director - Quality Control$106,194
- Associate Director - Business Analyst$118,893
- Principal - Technology$142,248
- Associate Specialist - Quality$100,600
- Manager - Quality$90,000
- Sr. Manager - Business Analyst$117,776
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).