Dachaigh › Luchd-obrach › Synechron, Inc. › Associate Director - Quality Control
Associate Director - Quality Control aig Synechron, Inc.: Tuarastalan H-1B
20 iarrtasan cumhaichean-obrach airson an dreuchd Associate Director - Quality Control aig Synechron, Inc.. Tuarastal bunasach meadhanach $106,194; leth meadhanach $101,858–$110,847.
Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$106,194
Leath mheadhanach nan tuarastalan$101,858–$110,847
Ceudail 10mh–90mh$98,821–$127,286
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $105,696 |
| FY2024 | 4 | $104,760 |
| FY2025 | 3 | $101,500 |
| FY2026 | 5 | $110,847 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $110,847 Ìre III | Charlotte, NC | 23 Màrt 2026 | 13 Gibl 2026 | Dearbhaichte |
| $110,847 Ìre III | Charlotte, NC | 16 Gearr 2026 | 23 Gearr 2026 | Dearbhaichte |
| $109,200 Ìre III | Chicago, IL | 4 Gearr 2026 | 11 Gearr 2026 | Dearbhaichte |
| $140,224 Ìre III | Charlotte, NC | 15 Dùbh 2025 | 31 Dùbh 2025 | Dearbhaichte |
| $140,224 Ìre III | Charlotte, NC | 15 Dùbh 2025 | 31 Dùbh 2025 | Air a tharraing air ais |
| $103,000 Ìre III | Charlotte, NC | 28 Samh 2025 | 19 Dùbh 2025 | Dearbhaichte |
| $101,500 Ìre III | Jacksonville, FL | 20 Màrt 2025 | 28 Màrt 2025 | Dearbhaichte |
| $101,500 Ìre II | Jacksonville, FL | 17 Màrt 2025 | 28 Màrt 2025 | Dearbhaichte |
| $107,388 Ìre III | Pittsburgh, PA | 28 Gearr 2025 | 17 Màrt 2025 | Dearbhaichte |
| $128,500 Ìre III | Piscataway, NJ | 11 Sult 2024 | 20 Sult 2024 | Dearbhaichte |
| $105,000 Ìre III | Saint Paul, MN | 19 Màrt 2024 | 25 Màrt 2024 | Dearbhaichte |
| $105,000 Ìre III | Saint Paul, MN | 18 Màrt 2024 | 25 Màrt 2024 | Air a tharraing air ais |
| $94,682 Ìre III | Charlotte, NC | 4 Dùbh 2023 | 25 Faoi 2024 | Dearbhaichte |
| $104,520 Ìre III | Addison, TX | 28 Samh 2023 | 7 Dùbh 2023 | Dearbhaichte |
| $108,461 Ìre III | Charlotte, NC | 24 Lùna 2023 | 4 Sult 2023 | Dearbhaichte |
| $118,518 Ìre III | Piscataway, NJ | 19 Cèit 2023 | 30 Cèit 2023 | Dearbhaichte |
| $126,766 Ìre III | Charlotte, NC | 3 Gibl 2023 | 1 Cèit 2023 | Dearbhaichte |
| $98,821 Ìre III | Charlotte, NC | 3 Gibl 2023 | 10 Gibl 2023 | Dearbhaichte |
| $98,821 Ìre III | Charlotte, NC | 31 Faoi 2023 | 15 Gearr 2023 | Dearbhaichte |
| $102,931 Ìre III | Chicago, IL | 9 Faoi 2023 | 25 Ògmh 2023 | Dearbhaichte |
Obraichean eile aig Synechron, Inc.
- Associate Specialist - Technology$115,000
- Specialist - Technology$115,960
- Lead - Technology$109,810
- Sr. Specialist - Technology$118,228
- Associate Principal - Technology$120,000
- Sr. Associate - Technology$108,514
- Associate Director - Technology$124,300
- Specialist - Quality Control$100,469
- Manager, Technology$112,986
- Lead – Quality Control$99,549
- Assistant Manager - Technology$109,550
- Sr. Manager - Technology$112,500
- Associate Specialist - Quality Control$102,326
- Sr. Specialist - Quality Control$108,225
- Sr. Manager - Quality Control$103,418
- Associate - Technology$107,487
- Manager, Quality Control$97,570
- Director, Technology$162,000
- Assistant Manager - Quality Control$84,422
- Associate Director - Business Analyst$118,893
- Principal - Technology$142,248
- Associate Specialist - Quality$100,600
- Manager - Quality$90,000
- Sr. Manager - Business Analyst$117,776
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).