Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Synechron, Inc. › Manager - Quality

Manager - Quality aig Synechron, Inc.: Tuarastalan H-1B

12 iarrtasan cumhaichean-obrach airson an dreuchd Manager - Quality aig Synechron, Inc.. Tuarastal bunasach meadhanach $90,000; leth meadhanach $85,335–$91,002.

Iarrtasan (LCAs)12
Tuarastal meadhanach a chaidh a thabhann$90,000
Leath mheadhanach nan tuarastalan$85,335–$91,002
Ceudail 10mh–90mh$85,037–$94,765

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$83,845
FY20241$90,000
FY20255$89,339
FY20262$95,832

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$94,053
Ìre II
Tampa, FL15 Cèit 202615 Ògmh 2026Dearbhaichte
$97,612
E-3 · Ìre III
Washington Township, OH17 Samh 20256 Faoi 2026Dearbhaichte
$97,612
E-3 · Ìre III
Washington Township, OH11 Samh 20256 Faoi 2026Air a tharraing air ais
$89,339
Ìre II
Charlotte, NC3 Iuch 202514 Iuch 2025Dearbhaichte
$89,339
Ìre II
Charlotte, NC30 Ògmh 202514 Iuch 2025Air a tharraing air ais
$91,002
Ìre II
Charlotte, NC23 Cèit 20254 Ògmh 2025Dearbhaichte
$85,335
Ìre II
Chandler, AZ15 Gibl 202528 Gibl 2025Dearbhaichte
$85,335
Ìre II
Chandler, AZ27 Màrt 20257 Gibl 2025Dearbhaichte
$90,000
Ìre II
Pittsburgh, PA19 Màrt 202528 Màrt 2025Dearbhaichte
$90,000
Ìre II
Charlotte, NC7 Lùna 202416 Lùna 2024Dearbhaichte
$85,925
Ìre II
Alpharetta, GA25 Sult 20231 Dàmh 2023Air a tharraing air ais
$83,845
Ìre II
Charlotte, NC13 Ògmh 20231 Dàmh 2023Dearbhaichte

Obraichean eile aig Synechron, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).