Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Turner Construction Company › Assistant Superintendent

Assistant Superintendent aig Turner Construction Company: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Assistant Superintendent aig Turner Construction Company. Tuarastal bunasach meadhanach $97,416; leth meadhanach $91,809–$108,397.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$97,416
Leath mheadhanach nan tuarastalan$91,809–$108,397
Ceudail 10mh–90mh$86,297–$123,584

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$94,871
FY20263$99,960

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$99,960
Ìre III
Dallas, TX7 Cèit 20261 Dàmh 2026Dearbhaichte, an uair sin air a tharraing air ais
$99,960
Ìre III
Dallas, TX7 Cèit 20261 Dàmh 2026Air a tharraing air ais
$99,960
Ìre III
Dallas, TX1 Cèit 20261 Dàmh 2026Air a tharraing air ais
$82,623
Ìre II
Desoto, KS1 Cèit 20261 Dàmh 2026Dearbhaichte
$133,709
Ìre III
Omaha, NE27 Gearr 202626 Lùna 2026Dearbhaichte
$94,871
Ìre III
Omaha, NE28 Gearr 202326 Lùna 2023Dearbhaichte

Obraichean eile aig Turner Construction Company

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).