Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Turner Construction Company › MEP Engineer

MEP Engineer aig Turner Construction Company: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd MEP Engineer aig Turner Construction Company. Tuarastal bunasach meadhanach $110,702; leth meadhanach $105,297–$129,184.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$110,702
Leath mheadhanach nan tuarastalan$105,297–$129,184
Ceudail 10mh–90mh$100,280–$141,696

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$99,150
FY20241$106,405
FY20252$129,640
FY20263$126,610

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,610
Ìre III
New York, NY20 Gibl 202611 Cèit 2026Dearbhaichte
$136,904
Ìre II
West Des Moines, IA19 Gearr 202619 Lùna 2026Dearbhaichte
$115,000
Ìre II
Fredericksburg, VA12 Faoi 20262 Gearr 2026Dearbhaichte
$115,000
Ìre II
Aldie, VA7 Faoi 202626 Faoi 2026Air a tharraing air ais
$152,876
Ìre IV
Omaha, NE26 Samh 20246 Faoi 2025Dearbhaichte
$106,405
Ìre II
Kansas City, MO27 Sult 202414 Màrt 2025Dearbhaichte
$106,405
Ìre II
Kansas City, MO16 Sult 202414 Màrt 2025Dearbhaichte, an uair sin air a tharraing air ais
$101,973
Ìre III
Kansas City, MO20 Gibl 202315 Cèit 2023Dearbhaichte
$96,328
Ìre III
West Des Moines, IA20 Gearr 202319 Lùna 2023Dearbhaichte

Obraichean eile aig Turner Construction Company

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).