Dachaigh › Luchd-obrach › Turner Construction Company › Engineer
Engineer aig Turner Construction Company: Tuarastalan H-1B
40 iarrtasan cumhaichean-obrach airson an dreuchd Engineer aig Turner Construction Company. Tuarastal bunasach meadhanach $103,300; leth meadhanach $94,495–$120,312.
Iarrtasan (LCAs)40
Tuarastal meadhanach a chaidh a thabhann$103,300
Leath mheadhanach nan tuarastalan$94,495–$120,312
Ceudail 10mh–90mh$90,434–$130,485
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 5 | $90,620 |
| FY2024 | 3 | $104,950 |
| FY2025 | 12 | $107,699 |
| FY2026 | 18 | $111,298 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $108,000 Ìre III | Apex, NC | 2 Ògmh 2026 | 15 Ògmh 2026 | Dearbhaichte |
| $111,530 Ìre III | Chicago, IL | 28 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $99,960 Ìre III | Dallas, TX | 28 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $111,065 Ìre III | Philadelphia, PA | 26 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $140,000 Ìre III | Walnut Creek, CA | 15 Cèit 2026 | 8 Ògmh 2026 | Dearbhaichte |
| $140,000 Ìre III | Walnut Creek, CA | 13 Cèit 2026 | 1 Dàmh 2026 | Air a tharraing air ais |
| $100,594 Ìre III | Council Bluffs, IA | 12 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $111,530 Ìre III | Chicago, IL | 5 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $113,038 Ìre III | Los Angeles, CA | 28 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $99,528 Ìre III | Kansas City, MO | 1 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $101,481 Ìre III | Adeli, IA | 1 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $131,618 Ìre III | Dallas, TX | 1 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $130,000 Ìre III | Haskell, TX | 28 Gearr 2026 | 23 Màrt 2026 | Dearbhaichte |
| $115,571 E-3 · Ìre II | San Francisco, CA | 26 Gearr 2026 | 30 Màrt 2026 | Dearbhaichte |
| $91,488 Ìre III | Council Bluffs, IA | 20 Gearr 2026 | 16 Màrt 2026 | Dearbhaichte |
| $137,639 Ìre IV | Seattle, WA | 13 Gearr 2026 | 12 Lùna 2026 | Dearbhaichte |
| $126,464 Ìre III | Fredericksburg, VA | 14 Faoi 2026 | 2 Gearr 2026 | Dearbhaichte |
| $97,968 E-3 · Ìre III | Altoona, IA | 30 Sult 2025 | 2 Faoi 2026 | Dearbhaichte |
| $91,331 Ìre III | Rayville, LA | 25 Sult 2025 | 15 Dàmh 2025 | Dearbhaichte |
| $91,331 Ìre III | Rayville, LA | 17 Sult 2025 | 15 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $101,650 Ìre II | Atlanta, GA | 27 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $100,509 Ìre III | Dallas, TX | 14 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $88,000 Ìre III | Memphis, TN | 15 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $95,439 Ìre III | Nashville, TN | 15 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $124,550 Ìre III | Corinne, UT | 8 Gibl 2025 | 28 Gibl 2025 | Dearbhaichte |
| $91,000 Ìre II | New Albany, OH | 20 Màrt 2025 | 14 Gibl 2025 | Dearbhaichte |
| $125,847 Ìre II | Lynnwood, WA | 26 Dùbh 2024 | 27 Ògmh 2025 | Dearbhaichte |
| $115,424 Ìre II | Omaha, NE | 15 Dàmh 2024 | 4 Samh 2024 | Dearbhaichte |
| $113,748 Ìre III | Corinne, UT | 9 Dàmh 2024 | 21 Dàmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $125,938 Ìre III | Sacramento, CA | 8 Dàmh 2024 | 4 Gibl 2025 | Dearbhaichte |
| $121,893 Ìre III | Dallas, TX | 1 Dàmh 2024 | 1 Gibl 2025 | Dearbhaichte |
| $135,000 Ìre III | Pendleton, SC | 30 Iuch 2024 | 19 Lùna 2024 | Dearbhaichte |
| $135,000 Ìre III | Seneca, SC | 24 Iuch 2024 | 19 Lùna 2024 | Air a tharraing air ais |
| $104,950 Ìre II | Atlanta, GA | 26 Màrt 2024 | 19 Gibl 2024 | Dearbhaichte |
| $89,670 Ìre III | West Des Moines, IA | 26 Gearr 2024 | 18 Lùna 2024 | Dearbhaichte |
| $84,049 Ìre II | Philadelphia, PA | 13 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $94,180 Ìre III | Altoona, IA | 24 Gearr 2023 | 22 Lùna 2023 | Dearbhaichte |
| $97,544 Ìre II | Bellevue, WA | 13 Gearr 2023 | 12 Lùna 2023 | Dearbhaichte |
| $90,620 Ìre II | Dallas, TX | 13 Gearr 2023 | 11 Lùna 2023 | Dearbhaichte |
| $90,000 Ìre II | Portland, OR | 4 Samh 2022 | 14 Dùbh 2022 | Dearbhaichte |
Engineer aig gach neach-fastaidh →
Obraichean eile aig Turner Construction Company
- Assistant Engineer$83,958
- Field Engineer$75,450
- MEP Engineer$110,702
- Special Projects Division Project Manager$118,983
- Construction Manager$118,632
- Estimator$102,226
- Assistant Estimator$84,081
- Civil Engineer$99,282
- Assistant Superintendent$97,416
- Superintendent$104,419
- Cost Analyst$94,101
- VDC Project Manager$122,500
- Project Engineer$123,771
- Assistant Engineer (Project Management Specialist)$89,456
- VDC Engineer$81,507
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).