Dachaigh › Gnìomhan › Civil Engineers › Tempe, AZ
Civil Engineers ann an Tempe, AZ: Tuarastalan H-1B
88 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Tempe, AZ. Tuarastal bunasach meadhanach $85,675; leth meadhanach $75,018–$96,422.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $74,901 |
| Ìre II (càileachail) | $89,003 |
| Ìre III (eòlach) | $99,900 |
| Ìre IV (gu lèir comasach) | $118,400 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- Project Engineer11
- Design Engineer7
- Field Engineer6
- Associate Engineer3
- Civil Engineer I3
- Structural Engineer3
- Digital Coordinator “ Digital Engineering3
- Principal Engineer2
- Engineer I2
- Assistant Project Manager, Civil2
- Project Manager, Civil Engineering2
- Traffic and Its Engineer2
- Senior Project Engineer2
- Project Controls Engineer2
- Sr. VDC Engineer2
Luchd-taic H-1B ann an Tempe, AZ →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).