Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Construction Managers › Chandler, AZ

Construction Managers ann an Chandler, AZ: Tuarastalan H-1B

27 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Chandler, AZ. Tuarastal bunasach meadhanach $112,216; leth meadhanach $93,842–$125,970.

Iarrtasan (LCAs)27
Tuarastal meadhanach a chaidh a thabhann$112,216
Leath mheadhanach nan tuarastalan$93,842–$125,970
Ceudail 10mh–90mh$81,931–$140,000

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$81,914
Ìre II (càileachail)$95,000
Ìre III (eòlach)$117,300
Ìre IV (gu lèir comasach)$140,000

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Intel Corporation8$121,964
Trenmor LLC5$99,362
DPS Group, Inc.2$140,000
Brycon Corporation2$87,342
Corbins Service Electric LLC1$95,000
DPS Group Global1$95,000
GCON Management Company, LLC1$70,990
Charter Mechanical Contractors, Inc.1$73,133
DPS Advanced Technology Group, Inc.1$95,000
Skanska USA Building Inc.1$115,000
VSS International, Inc.1$81,827
Hensel Phelps Construction Co1$99,362
Turner & Townsend, Inc.1$202,000
PCL Industrial Services, Inc.1$133,827

Tiotalan dreuchd

Luchd-taic H-1B ann an Chandler, AZ →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).