Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Construction Managers › Tempe, AZ

Construction Managers ann an Tempe, AZ: Tuarastalan H-1B

41 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Tempe, AZ. Tuarastal bunasach meadhanach $92,685; leth meadhanach $84,011–$122,550.

Iarrtasan (LCAs)41
Tuarastal meadhanach a chaidh a thabhann$92,685
Leath mheadhanach nan tuarastalan$84,011–$122,550
Ceudail 10mh–90mh$81,827–$134,430

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$81,827
Ìre II (càileachail)$99,362
Ìre III (eòlach)$117,957
Ìre IV (gu lèir comasach)$134,128

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Sundt Construction, Inc.14$86,195
PCL Construction, Inc.4$89,940
SDB, Inc.4$81,827
Trenmor LLC4$126,194
Rosendin Electric Inc.3$81,827
Clayco, Inc.2$179,000
DBM Vircon Services (USA), Inc.2$132,798
Wilson Engineers, LLC.2$81,827
Jing He Science Arizona, Inc.2$100,930
Level 7 Technologies LLC1$87,000
Currie & Brown Inc.1$131,768
Terracon Consultants, Inc.1$125,100
Alexander Building Company, Inc.1$88,000

Tiotalan dreuchd

Luchd-taic H-1B ann an Tempe, AZ →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).