Dachaigh › Gnìomhan › Cost Estimators › Austin, TX
Cost Estimators ann an Austin, TX: Tuarastalan H-1B
33 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Austin, TX. Tuarastal bunasach meadhanach $106,371; leth meadhanach $87,568–$115,000.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $60,000 |
| Ìre II (càileachail) | $99,850 |
| Ìre III (eòlach) | $105,000 |
| Ìre IV (gu lèir comasach) | $110,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Swinerton Builders | 3 | $106,900 |
| Fluor Enterprises, Inc. | 2 | $94,186 |
| Ferrovial Construction US Corp. | 2 | $118,500 |
| Trenmor LLC | 2 | $97,261 |
| Wurzel Builders, LTD | 2 | $105,000 |
| Reinforced Structures, Inc | 1 | $135,000 |
| WTP America LLC | 1 | $96,800 |
| Recurrent Energy Development Holdings, LLC | 1 | $87,568 |
| Balfour Beatty Infrastructure Inc. | 1 | $83,000 |
| Majestic Services, Inc. | 1 | $72,000 |
| Atkins North America Inc. | 1 | $115,000 |
| Structure Tone, LLC | 1 | $73,632 |
| AtkinsRéalis USA Inc. | 1 | $115,000 |
| Dell Products L.P. | 1 | $137,859 |
| Spire Consulting Group, LLC | 1 | $87,568 |
| Flintco, LLC | 1 | $124,200 |
| Charles N. White Construction Company | 1 | $124,740 |
| Rider Levett Bucknall Ltd. | 1 | $95,000 |
| Ryan Companies US, Inc. | 1 | $115,000 |
| The Burt Group, Inc. | 1 | $92,800 |
| DPR Construction, A General Partnership | 1 | $110,000 |
| Infrastructure Development Engineering Associates, LLC | 1 | $60,000 |
| Runjesnor, LP | 1 | $67,600 |
| Sunland Group, Inc. | 1 | $110,000 |
| AtkinsRealis USA Inc. | 1 | $125,580 |
| Turner Construction Company | 1 | $130,000 |
| ELITE Engineering and Constructions LLC | 1 | $82,000 |
Tiotalan dreuchd
- Estimator6
- Cost Estimator3
- Sr. Estimator3
- Cost Manager2
- Senior Estimator2
- CSA Estimator2
- Associate Project Controls Specialist III1
- Senior Analyst, Estimating1
- Construction Estimator1
- Commercial Construction Estimator1
- Junior Estimator1
- Consultant, Commodity Management1
- Cost Consultant1
- Project Controls Specialist1
- Chief Estimator1
Luchd-taic H-1B ann an Austin, TX →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).