Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Cost Estimators › Seattle, WA

Cost Estimators ann an Seattle, WA: Tuarastalan H-1B

24 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Seattle, WA. Tuarastal bunasach meadhanach $118,560; leth meadhanach $100,000–$125,337.

Iarrtasan (LCAs)24
Tuarastal meadhanach a chaidh a thabhann$118,560
Leath mheadhanach nan tuarastalan$100,000–$125,337
Ceudail 10mh–90mh$81,209–$152,200

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$62,546
Ìre II (càileachail)$89,484
Ìre III (eòlach)$120,000
Ìre IV (gu lèir comasach)$129,648

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Turner & Townsend, Inc.5$125,000
OCMI, Inc.4$125,000
Cumming Management Group, Inc.4$112,000
Rider Levett Bucknall Ltd.2$195,000
Morgner Technology Management2$122,117
Abbott Construction LLC2$107,585
Graham Construction and Management Inc.1$75,000
AECOM Technical Services Inc1$88,968
Sunset Grill Construction LLC1$90,000
Steeler Inc.1$62,546
Marpac Construction L.L.C.1$79,269

Tiotalan dreuchd

Luchd-taic H-1B ann an Seattle, WA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).