首页 › 职业 › Industrial Engineers › Devens, MA
MA州Devens市的Industrial Engineers职位:H-1B薪资
工作地点位于MA州Devens市的该职业共有68份劳工条件申请。提供的基本薪资中位数为$110,000;中间50%区间为$96,366至$129,821。
申请(LCAs)68
薪资中位数$110,000
薪资中间区间$96,366–$129,821
第10至第90百分位$87,140–$150,107
按薪资等级
| 工资等级 | 薪资中位数 |
|---|---|
| I级(入门) | $85,000 |
| II级(合格) | $97,000 |
| III级(有经验) | $120,000 |
| IV级(完全胜任) | $140,000 |
劳工部为每个职业和地区设定了四个现行工资等级,从一级(入门)到四级(完全胜任)。雇主根据职位要求选择合适的等级。
雇主
| 雇主 | LCA数量 | 薪资中位数 |
|---|---|---|
| Bristol-Myers Squibb Company | 27 | $128,750 |
| Implify Inc | 9 | $91,770 |
| Commonwealth Fusion HR LLC | 6 | $124,000 |
| Electric Hydrogen Co | 3 | $89,000 |
| QvalFocus Inc. | 3 | $111,613 |
| Sathram Corporation | 2 | $90,511 |
| Veranova, L.P. | 2 | $129,223 |
| United Pharma Technologies, Inc. | 2 | $96,023 |
| Watson-Marlow America Manufacturing, Inc. | 1 | $99,237 |
| Watson-Marlow America Manufacuring, Inc. | 1 | $99,237 |
| Katalyst Healthcares & Life Sciences Inc. | 1 | $94,141 |
| Azzur Group LLC | 1 | $85,000 |
| SMC Ltd. | 1 | $110,000 |
| Azzur Group DBA, Azzur Consulting LLC | 1 | $93,096 |
| Kelith Group Inc | 1 | $98,405 |
| Nypro, Inc., a Jabil Company | 1 | $107,169 |
| Unicon Pharma Inc | 1 | $96,366 |
| VAStek Inc. | 1 | — |
| ONEUS Technologies LLC | 1 | $94,682 |
| Watson Marlow Americas Manufacturing Inc. | 1 | $151,749 |
| Fuera Emerging Technologies Inc | 1 | $96,366 |
| Bothwell Engineering Inc. | 1 | $112,995 |
职位名称
- Validation Engineer13
- Computer System Validation Engineer4
- Manager, Quality Engineering Cell Therapy2
- Senior Specialist, Laboratory and Quality System Engineer2
- Quality Validation Engineer2
- Quality Engineer2
- Senior Thermal Fluids Analyst/Engineer2
- Senior MES Engineer2
- Senior Specialist, Validation Engineer2
- Associate Director, Devens CTS MES1
- Senior Manager Validation Engineering1
- Sr. Mgr. Operational Excellence1
- CQV Engineer1
- Senior Manager - Automation1
- HTS Manufacturing Engineer1
薪资为每份申请中提供的工资下限,已转换为年度金额;统计数据仅使用已认证的全职申请。LCA 并非签证批准,一份 LCA 可涵盖多个职位。 来源:美国劳工部 OFLC LCA 披露数据,财年 2023–2026(最新决定日期 2026年6月30日)。