Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Burns & Mcdonnell Engineering Company, Inc. › Section Manager

Section Manager aig Burns & Mcdonnell Engineering Company, Inc.: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Section Manager aig Burns & Mcdonnell Engineering Company, Inc.. Tuarastal bunasach meadhanach $147,358; leth meadhanach $131,477–$149,074.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$147,358
Leath mheadhanach nan tuarastalan$131,477–$149,074
Ceudail 10mh–90mh$127,707–$151,574

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$149,074
FY20242$141,316
FY20252$128,737
FY20261$147,358

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$147,358Kansas City, MO30 Gibl 202625 Dàmh 2026Dearbhaichte
$114,947Southfield, MI30 Ògmh 202526 Dùbh 2025Dearbhaichte
$142,527
Ìre II
Kansas City, MO14 Màrt 202512 Sult 2025Dearbhaichte
$151,154
Ìre III
Detroit, MI10 Faoi 202417 Faoi 2024Dearbhaichte
$131,477
Ìre II
Kansas City, MO25 Dàmh 20231 Samh 2023Dearbhaichte
$130,897Wallingford, CT3 Iuch 202320 Dùbh 2023Dearbhaichte
$149,074
Ìre II
Houston, TX12 Cèit 202324 Cèit 2023Dearbhaichte
$149,074
Ìre II
Austin, TX12 Cèit 202324 Cèit 2023Dearbhaichte
$153,254
Ìre II
Centennial, CO15 Gearr 202327 Gearr 2023Dearbhaichte

Obraichean eile aig Burns & Mcdonnell Engineering Company, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).