Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Burns & Mcdonnell Engineering Company, Inc. › Staff Structural Engineer

Staff Structural Engineer aig Burns & Mcdonnell Engineering Company, Inc.: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Staff Structural Engineer aig Burns & Mcdonnell Engineering Company, Inc.. Tuarastal bunasach meadhanach $86,924; leth meadhanach $86,516–$90,071.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$86,924
Leath mheadhanach nan tuarastalan$86,516–$90,071
Ceudail 10mh–90mh$80,174–$91,812

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$78,468
FY20242$87,877
FY20254$86,693
FY20262$92,548

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$94,535Englewood, CO10 Ògmh 20264 Dùbh 2026Dearbhaichte
$90,561Dallas, TX21 Gibl 202627 Gibl 2026Dearbhaichte
$86,457Cary, NC10 Ògmh 202525 Lùna 2025Dearbhaichte
$86,691Dallas, TX25 Gibl 20251 Dàmh 2025Dearbhaichte
$86,695Detroit, MI31 Faoi 202531 Iuch 2025Dearbhaichte
$91,509Vancouver, WA6 Dùbh 20246 Faoi 2025Dearbhaichte, an uair sin air a tharraing air ais
$88,602Englewood, CO24 Cèit 202416 Samh 2024Dearbhaichte
$87,152
Ìre II
Englewood, CO28 Sult 20234 Dùbh 2023Dearbhaichte
$80,600
Ìre II
Conshohocken, PA4 Lùna 202311 Sult 2023Dearbhaichte
$76,336
Ìre II
Kansas City, MO10 Gibl 202330 Sult 2023Dearbhaichte

Obraichean eile aig Burns & Mcdonnell Engineering Company, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).