Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Burns & Mcdonnell Engineering Company, Inc. › Transmission Planning Consultant

Transmission Planning Consultant aig Burns & Mcdonnell Engineering Company, Inc.: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Transmission Planning Consultant aig Burns & Mcdonnell Engineering Company, Inc.. Tuarastal bunasach meadhanach $90,718; leth meadhanach $88,293–$95,880.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$90,718
Leath mheadhanach nan tuarastalan$88,293–$95,880
Ceudail 10mh–90mh$84,279–$106,787

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$98,831
FY20252$90,850
FY20264$89,604

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$88,648Atlanta, GA2 Ògmh 202615 Ògmh 2026Dearbhaichte, an uair sin air a tharraing air ais
$92,020Austin, TX9 Gibl 20261 Dàmh 2026Dearbhaichte
$90,561Dallas, TX26 Màrt 202613 Gibl 2026Dearbhaichte
$88,175Phoenix, AZ5 Màrt 202630 Lùna 2026Dearbhaichte
$97,166Houston, TX5 Cèit 202512 Cèit 2025Dearbhaichte
$84,535Brookhaven, GA25 Dàmh 202424 Gibl 2025Dearbhaichte
$106,787
Ìre II
Austin, TX3 Sult 20231 Dàmh 2023Dearbhaichte
$106,787
Ìre II
Austin, TX17 Lùna 20231 Dàmh 2023Dearbhaichte
$90,875
Ìre II
Houston, TX10 Gibl 202330 Lùna 2023Dearbhaichte
$81,973
Ìre II
Phoenix, AZ10 Gibl 202330 Lùna 2023Dearbhaichte

Obraichean eile aig Burns & Mcdonnell Engineering Company, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).