Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Burns & Mcdonnell Engineering Company, Inc. › Staff Electrical Specialist

Staff Electrical Specialist aig Burns & Mcdonnell Engineering Company, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Staff Electrical Specialist aig Burns & Mcdonnell Engineering Company, Inc.. Tuarastal bunasach meadhanach $86,695; leth meadhanach $82,389–$86,695.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$86,695
Leath mheadhanach nan tuarastalan$82,389–$86,695
Ceudail 10mh–90mh$82,064–$96,649

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$82,118
FY20252$86,695
FY20261$103,285

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$103,285Southfield, MI4 Cèit 202620 Dàmh 2026Dearbhaichte
$86,695Southfield, MI21 Gibl 202525 Sult 2025Dearbhaichte
$86,695Southfield, MI4 Gibl 202530 Sult 2025Dearbhaichte, an uair sin air a tharraing air ais
$81,848
Ìre IV
Detroit, MI30 Ògmh 202324 Iuch 2023Dearbhaichte
$82,389
Ìre IV
Houston, TX24 Màrt 20233 Gibl 2023Dearbhaichte

Obraichean eile aig Burns & Mcdonnell Engineering Company, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).