Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Burns & Mcdonnell Engineering Company, Inc. › Staff Distribution Engineer

Staff Distribution Engineer aig Burns & Mcdonnell Engineering Company, Inc.: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Staff Distribution Engineer aig Burns & Mcdonnell Engineering Company, Inc.. Tuarastal bunasach meadhanach $97,282; leth meadhanach $93,182–$108,243.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$97,282
Leath mheadhanach nan tuarastalan$93,182–$108,243
Ceudail 10mh–90mh$91,471–$108,404

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$97,282
FY20246$100,274
FY20252$102,830

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$109,850Brookhaven, GA4 Ògmh 20252 Dùbh 2025Dearbhaichte
$95,811Arlington, VA15 Dàmh 20244 Gibl 2025Dearbhaichte
$92,305Morristown, NJ24 Iuch 202431 Iuch 2024Dearbhaichte
$92,305Detroit, MI12 Iuch 202419 Iuch 2024Dearbhaichte
$83,964Atlanta, GA11 Ògmh 202430 Samh 2024Dearbhaichte
$108,243
Ìre II
Eveleth, MN19 Dùbh 202326 Dùbh 2023Dearbhaichte
$108,243
Ìre II
Albuquerque, NM19 Dùbh 202326 Dùbh 2023Dearbhaichte
$108,243
Ìre II
Fort Worth, TX19 Dùbh 202326 Dùbh 2023Dearbhaichte
$97,282
Ìre II
Brookhaven, GA4 Sult 20231 Màrt 2024Dearbhaichte
$97,282
Ìre II
Brookhaven, GA4 Sult 202329 Gearr 2024Dearbhaichte

Obraichean eile aig Burns & Mcdonnell Engineering Company, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).