Dachaigh › Gnìomhan › Civil Engineers › Charlotte, NC
Civil Engineers ann an Charlotte, NC: Tuarastalan H-1B
127 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Charlotte, NC. Tuarastal bunasach meadhanach $85,000; leth meadhanach $73,840–$99,382.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $72,238 |
| Ìre II (càileachail) | $87,755 |
| Ìre III (eòlach) | $100,612 |
| Ìre IV (gu lèir comasach) | $118,789 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- Project Engineer18
- Assistant Project Manager9
- Project Manager5
- Structural Engineer4
- Project Engineer (Civil/Construction)4
- Water Resources Engineer3
- Field Engineer3
- Senior Project Engineer3
- Staff Engineer3
- Engineer2
- CMT Project Manager2
- Civil Engineer2
- Project Designer2
- Project Engineer I2
- Senior Engineer2
Luchd-taic H-1B ann an Charlotte, NC →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).