Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Civil Engineer 1

Civil Engineer 1 aig Black & Veatch Corporation: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Civil Engineer 1 aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $64,220; leth meadhanach $61,729–$64,823.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$64,220
Leath mheadhanach nan tuarastalan$61,729–$64,823
Ceudail 10mh–90mh$58,032–$65,852

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$66,726
FY20242$59,602
FY20253$64,355

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$64,979–$110,275
Ìre I
Austin, TX2 Ògmh 20251 Dàmh 2025Dearbhaichte
$64,355–$110,275
Ìre I
Houston, TX20 Cèit 20251 Dàmh 2025Dearbhaichte
$60,944–$105,263
Ìre I
Atlanta, GA7 Cèit 20251 Dàmh 2025Dearbhaichte
$64,085–$96,860
Ìre I
Tampa, FL24 Cèit 20241 Dàmh 2024Dearbhaichte
$55,120–$96,860
Ìre I
Coral Springs, FL29 Gibl 20241 Dàmh 2024Dearbhaichte
$66,726–$115,313
Ìre I
New York, NY27 Gibl 20231 Dàmh 2023Dearbhaichte

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).