Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Electrical Engineer 4 - Substation Design

Electrical Engineer 4 - Substation Design aig Black & Veatch Corporation: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Electrical Engineer 4 - Substation Design aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $118,192; leth meadhanach $102,070–$123,568.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$118,192
Leath mheadhanach nan tuarastalan$102,070–$123,568
Ceudail 10mh–90mh$98,316–$124,426

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$98,316
FY20241$123,053
FY20253$123,739

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$113,330–$184,075Walnut Creek, CA24 Gibl 20255 Cèit 2025Dearbhaichte
$123,739–$154,623
Ìre IV
Dallas, TX11 Gibl 202510 Dàmh 2025Dearbhaichte
$125,112–$169,349Irvine, CA1 Samh 202411 Samh 2024Dearbhaichte
$123,053–$169,349Irvine, CA17 Iuch 202426 Lùna 2024Dearbhaichte
$98,316–$140,858Dallas, TX20 Gibl 20231 Ògmh 2023Dearbhaichte
$98,316–$135,261Houston, TX27 Sult 202210 Dàmh 2022Dearbhaichte

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).