Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Project Controls Analyst

Project Controls Analyst aig Black & Veatch Corporation: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Project Controls Analyst aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $96,658; leth meadhanach $85,501–$96,658.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$96,658
Leath mheadhanach nan tuarastalan$85,501–$96,658
Ceudail 10mh–90mh$80,683–$108,605

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$84,947
FY20241$63,627
FY20251$107,182
FY20266$96,658

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$96,658–$132,006
Ìre II
Overland Park, KS31 Màrt 202625 Sult 2026Dearbhaichte
$96,658–$125,720
Ìre II
Overland Park, KS26 Màrt 20266 Gibl 2026Dearbhaichte
$114,296–$150,864
Ìre II
Arlington, VA10 Gearr 202631 Iuch 2026Dearbhaichte
$96,658–$132,006
Ìre II
Overland Park, KS21 Faoi 20265 Gearr 2026Dearbhaichte
$85,501–$132,006
Ìre II
Overland Park, KS31 Dùbh 20252 Gearr 2026Dearbhaichte
$90,085–$132,006
Ìre II
Dallas, TX6 Samh 202517 Samh 2025Dearbhaichte
$90,085–$132,006
Ìre II
Dallas, TX5 Samh 202517 Samh 2025Air a tharraing air ais
$107,182–$145,080
Ìre II
Livermore, CA4 Gearr 202524 Gearr 2025Dearbhaichte
$63,627–$120,900
Ìre I
Overland Park, KS1 Màrt 20244 Màrt 2024Dearbhaichte
$84,947–$112,990
Ìre II
Dallas, TX14 Iuch 202325 Sult 2023Dearbhaichte

Project Controls Analyst aig gach neach-fastaidh →

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).