Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Civil Engineer 4

Civil Engineer 4 aig Black & Veatch Corporation: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Civil Engineer 4 aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $103,576; leth meadhanach $96,073–$120,603.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$103,576
Leath mheadhanach nan tuarastalan$96,073–$120,603
Ceudail 10mh–90mh$90,835–$132,954

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$95,894
FY20243$101,920
FY20253$127,606

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$145,434–$190,513
Ìre IV
Walnut Creek, CA26 Ògmh 202521 Samh 2025Dearbhaichte
$118,269–$161,986
Ìre IV
Houston, TX14 Gearr 202515 Lùna 2025Dearbhaichte
$127,606–$184,075San Jose, CA7 Gearr 20251 Màrt 2025Dearbhaichte
$79,872–$147,260
Ìre IV
Myrtle Beach, SC29 Gibl 20241 Dàmh 2024Dearbhaichte
$105,233–$161,986Burlington, MA10 Gibl 202415 Gibl 2024Dearbhaichte
$101,920–$134,150
Ìre IV
Phoenix, AZ18 Faoi 202426 Gearr 2024Dearbhaichte
$95,534–$134,150Canonsburg, PA16 Lùna 202321 Lùna 2023Dearbhaichte
$95,534–$134,150Canonsburg, PA16 Lùna 202321 Lùna 2023Air a tharraing air ais
$96,253–$128,820Coral Springs, FL24 Màrt 20231 Cèit 2023Dearbhaichte

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).