Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Staff Engineer, Electrical

Staff Engineer, Electrical aig Black & Veatch Corporation: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Staff Engineer, Electrical aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $119,440; leth meadhanach $113,343–$126,714.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$119,440
Leath mheadhanach nan tuarastalan$113,343–$126,714
Ceudail 10mh–90mh$108,642–$131,219

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20265$119,440

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$119,440–$210,220Irvine, CA20 Cèit 20261 Dàmh 2026Dearbhaichte
$105,508–$191,940Ann Arbor, MI6 Gibl 202613 Gibl 2026Dearbhaichte
$113,343–$201,080Austin, TX24 Màrt 20266 Gibl 2026Dearbhaichte
$126,714–$191,940
Ìre IV
Ann Arbor, MI15 Dùbh 20255 Ògmh 2026Dearbhaichte
$134,222–$182,800
Ìre IV
Orlando, FL3 Samh 20251 Dùbh 2025Dearbhaichte

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).