Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Civil Engineer 3

Civil Engineer 3 aig Black & Veatch Corporation: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Civil Engineer 3 aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $84,042; leth meadhanach $82,612–$85,155.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$84,042
Leath mheadhanach nan tuarastalan$82,612–$85,155
Ceudail 10mh–90mh$80,307–$88,019

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$76,274
FY20241$82,805
FY20256$84,635

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$94,702–$139,188
Ìre II
Tualatin, OR21 Iuch 20256 Faoi 2026Dearbhaichte
$83,970–$139,188
Ìre II
Las Vegas, NV13 Cèit 20251 Dàmh 2025Dearbhaichte
$85,155–$114,520
Ìre II
Coral Springs, FL3 Gibl 20251 Dàmh 2025Dearbhaichte
$85,155–$128,080
Ìre II
Tampa, FL3 Dùbh 202430 Cèit 2025Dearbhaichte
$82,035–$128,080
Ìre II
Orlando, FL25 Dàmh 202425 Gibl 2025Dearbhaichte
$84,115–$121,676
Ìre II
Greenville, SC21 Dàmh 202418 Gibl 2025Dearbhaichte
$82,805–$134,484
Ìre II
Tualatin, OR14 Cèit 202413 Samh 2024Dearbhaichte
$76,274–$112,090
Ìre II
Orlando, FL5 Dùbh 20229 Faoi 2023Dearbhaichte

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).