Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Black & Veatch Corporation › Instrument/Control Engineer 3

Instrument/Control Engineer 3 aig Black & Veatch Corporation: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Instrument/Control Engineer 3 aig Black & Veatch Corporation. Tuarastal bunasach meadhanach $95,098; leth meadhanach $92,955–$98,888.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$95,098
Leath mheadhanach nan tuarastalan$92,955–$98,888
Ceudail 10mh–90mh$92,955–$101,856

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$103,834
FY20253$92,955

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$97,157–$139,173
pàirt-àm · Ìre II
Atlanta, GA19 Lùna 202525 Lùna 2025Dearbhaichte
$97,240–$112,604
Ìre II
Chattanooga, TN3 Ògmh 20251 Dàmh 2025Dearbhaichte
$92,955–$139,188
Ìre II
Atlanta, GA13 Cèit 202511 Samh 2025Dearbhaichte
$92,955–$139,188
Ìre II
Atlanta, GA8 Cèit 20255 Samh 2025Dearbhaichte
$103,834–$128,080
Ìre II
Pelham, AL29 Gibl 20241 Dàmh 2024Dearbhaichte

Obraichean eile aig Black & Veatch Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).